This week my supervisor has suddenly shown interest on my research work. He decided that my design needs to be changed as he doesn't think that the model that is currently being fabricated will give good results. He wants me to use ABS i.e. a type of plastic for the wing skin which I have been proposing in my last two papers that he had failed to read obviously. Now I need to change my whole design as the new model which does not require ribs will be manufactured using a rapid prototyping machine which comes with its own set of limitations. On top of that, I just found out today that he wants the wind tunnel test to be carried out in August which is 2 months away. This is due to the fact that the reasearch grant that is funding my project will expire in November and a report of the experimental results will be due at that time.
I'm not complaining about all the extra work that I need to do, I just wish that I was given some warning. I have two months to finalize my design, draw it up using CATIA, manufacture the model, install the SMA wire - which have yet to be purchased by RMIT, make sure that the model works and set it up for the testing. However there is silver lining. Another postgraduate student will be paid to help me with the assembly and testing. Phew! Atleast I had a good lunch today. Nasi lemak that I made for the first time. It turned out better than expected. Yummy.
No comments:
Post a Comment